Extension budget calculator

Extension budget tools

Indicative planning allowance for a straightforward 20–40m² single-storey rear London extension. Not a guaranteed BCS quote.

BCS indicative rates: £2,800–£3,100/m² excluding VAT

Your figures

New internal floor area, from 20 to 40 m², with up to two decimal places. Use a dot for decimals. Outside this range, get a project-specific quote.
Edit rates, contingency and date of rates
Starts at the BCS indicative rate of £2,800/m². You can replace it with a rate you were given, using numbers only, with no £ sign or commas.
Starts at the BCS indicative rate of £3,100/m². If you edit it, keep the same scope and VAT basis as the low rate. It must be equal to or higher than the low rate.
Starts at 10%. This is an editable starting reserve, not a risk assessment. Enter 0 for no reserve.
Starts at 5 November 2026, when BCS adopted its indicative rates. If you enter your own rates, enter their date. It is shown with your result as a record and does not reprice anything. It can't be later than today.

What the rates cover

A straightforward, non-luxury single-storey rear extension of 20–40 m² on an ordinary, accessible site, with standard construction: foundations, walls and structure, roof, standard external glazing, first-fix services and plastering.

Not included

Kitchen, bathroom and other fit-out; decoration and floor finishes; works to the existing house; architect, engineer, planning, building control and party wall costs; abnormal ground, structural or access conditions.

The rates exclude VAT. The VAT figure is an illustration at the standard 20% rate on the total allowance (about £3,360–£3,720/m² before contingency). It is not an invoice or a statement of tax owed. Whether VAT applies depends on the supplier and the work. The reserve is a budget amount, so VAT shown on it is illustrative only.

How the figures are worked out

Base allowance = area × rate, worked out separately for the low and high rates and rounded to the nearest penny, with halves rounded up. Contingency reserve = base allowance × contingency ÷ 100, rounded the same way. Total allowance = base allowance + contingency reserve, all excluding VAT. The VAT illustration is 20% of the total allowance, rounded the same way, and is added to give the total including VAT. All calculations use whole-penny arithmetic. Nothing updates automatically.

What this calculator doesn't do

It covers only straightforward single-storey rear extensions of 20–40 m² on an ordinary, accessible site, and only the common core build. It does not check whether rates you enter are current or cover the same scope. It does not assess risk, so the contingency is a starting figure you can change. The VAT figure is an illustration at 20%, not an invoice or a statement of what VAT you would pay. For larger, smaller, multi-storey or unusual projects, get a project-specific quote.

About the BCS indicative rates

The starting rates are BCS Builders London's own indicative planning rates, adopted on 5 November 2026. They are not a market average, a record of completed projects, a past BCS price list or a quote. Real costs depend on design, specification, site access, ground and structural conditions and scope, and may fall outside this band. Your project needs its own assessment and a written quote. If you enter rates you were given, take both from the same source, for the same scope and VAT basis, and enter their date. Edited figures are yours, not BCS figures, and the scope and exclusions shown here still apply.

Talk to BCS Builders London about your extension

Guides to using the calculator