Looking up at the exposed timber joists during work on Trinity Road, SW18.
At Trinity Road, SW18, the strip-out stage opened the building right up and showed us what we had to work with. With the interior partly stripped back, the timber joists were exposed and there were open areas where ceilings and floors were not in place. Masonry and blockwork showed through on the walls.
Outside, white scaffold sheeting wrapped the building and a red rubble chute ran down the frontage. Inside, scaffold platforms stood among the open structure.
On site at Trinity Road
At the back, scaffold levels ran up the exposed brickwork, with timber and materials gathered below.The chimney stack and dark masonry stood exposed, with scaffold planks above the rubble.Timber joists and a broad length of timber ran overhead, above the pale blockwork and scaffold poles.Up close, timber and metal fixings sat against the blockwork, with green laser lines across them.A bolted timber beam and upright framing, surrounded by scaffold tubes and planks.Beneath the scaffold platform, a stepladder stood next to the pale timber frame and grey blockwork.Looking up at the edge of a timber deck, with scaffold tubes and an opening through to the interior.From the scaffold, the open work area below held pipes, boards and loose masonry.Looking down between the exposed stone walls to scaffold boards, stacked timbers and rubble.From outside, white scaffold sheeting surrounds the building on Trinity Road, SW18.The red rubble chute came down the sheeted frontage, beside the arched brick openings.
If you are planning work on your own home, have a look at our house renovations in London page and get in touch.