Trinity Road, SW18: A Look at the Work in Progress

Home > News > Trinity Road, SW18: A Look at the Work in Progress
Exposed timber joists viewed from below inside the building
Looking up at the exposed timber joists during work on Trinity Road, SW18.

At Trinity Road, SW18, the strip-out stage opened the building right up and showed us what we had to work with. With the interior partly stripped back, the timber joists were exposed and there were open areas where ceilings and floors were not in place. Masonry and blockwork showed through on the walls.

Outside, white scaffold sheeting wrapped the building and a red rubble chute ran down the frontage. Inside, scaffold platforms stood among the open structure.

On site at Trinity Road

If you are planning work on your own home, have a look at our house renovations in London page and get in touch.

Back to News Back to News